Soil study in Granada, Meta: NSR-10 requirements and what it includes

Updated November 11, 2026 By Civil Engineer Daniel Horacio Osorio Conde, Grupo D&H y Nacional de Terrenos

Many people buy a lot and immediately think about house plans. But before the design, there's a step that defines the safety and cost of the construction: the Soil study in Granada, Meta. As engineers who build housing in the Ariari region, we explain what it is, when the law requires it, how many soundings the NSR-10 requires, what the report should contain, and why it is also advisable before a Purchase and sale of properties in Granada, Meta or a Sale of lots in Granada, Meta.

Write to us on WhatsApp Call: 310 277 8583

What is a soil study in Granada, Meta?

It's a geotechnical study that analyzes the land where construction will take place: the type of soil, its load-bearing capacity, the depth of the water table, and how the soil will behave under the structure and during an earthquake. With this information, the structural engineer designs the appropriate foundation, and the geotechnical engineer recommends the best methods for excavation and backfilling.

When is it mandatory in Granada, Meta

  • Properties in Granada, Meta: a complete guide to lots, houses and farms
  • Law 400 of 1997 y NSR-10 Regulation, Title H: establishes the requirements for geotechnical studies of buildings in Colombia.
  • Building permit: For new construction, the application includes a geotechnical and soil study signed by a licensed civil engineer, along with structural plans and calculation reports. See Building permit in Granada.
  • Urbanizations and subdivisions: In addition to soil studies, the authority may request hazard and risk studies, especially near rivers and streams.
Whether the house is one or two stories, the terrain must be known before designing the foundation. Title E of the NSR-10 simplifies the structural design of these homes, but not the need to know what type of soil they are built on.

Construction categories and number of boreholes (NSR-10)

The NSR-10 classifies each construction unit according to its number of levels and the loads it transmits to the ground (Table H.3.1-1), and with that category defines the minimum exploration (Table H.3.2-1):

CategoryLevelsMaximum service loads on columnsMinimum surveysMinimum depth
LowUp to 3Less than 800 kN36 m
AverageFrom 4 to 10Between 801 and 4,000 kN415 m
HighFrom 11 to 20Between 4,001 and 8,000 kN425 m
SpecialMore than 20Greater than 8,000 kN530 m

Most houses and small buildings in Granada are classified as low-grade. The most unfavorable grade based on levels and loads is used, and the geotechnical engineer may expand the exploration if difficult soils are encountered.

What the study reviews

AspectWhat isWhy it matters
Stratigraphic profileSoil layers and their thicknessesDefine the depth at which firm ground is found.
Load-bearing capacityLoad that the soil can withstand without failingDimension footings, foundation beams or piles
SettlementsHow much will the structure sink over time?Prevent cracks in walls and floors
Groundwater levelDepth of groundwaterKey in flat areas and near the Ariari and its channels
Expansive or soft soilsSwelling clays or compressing soilsThey require special foundation solutions
FillingsUncontrolled man-made materialThey are not suitable for supporting foundations
Seismic soil profileSoil type A to F according to Title AAdjust the seismic forces of the structural design
Excavations and slopesStability of cuts and fillingsSafety during construction and with the neighbors

Most common field and laboratory tests

  • Soundings and test pits to see the soil and take samples.
  • Standard Penetration Test (SPT) to estimate field resistance.
  • Natural humidity, Atterberg limits, and particle size to classify the soil.
  • Unconfined compression or shear for the resistance of fine soils.
  • Consolidation when there are soft soils and settling is expected.

Write to us on WhatsApp Call: 310 277 8583

What should the report contain?

  1. Project description and its category according to NSR-10.
  2. Location of the boreholes and drilling logs.
  3. Laboratory results and soil profile.
  4. Groundwater level found.
  5. Soil profile type for seismic design.
  6. Foundation recommendations: type, depth and allowable capacity.
  7. Expected settlements.
  8. Recommendations for excavation, drainage, backfilling and protection of neighbors.
  9. Signature of the responsible engineer with their professional registration number.

What we usually find in the soils of Granada

Granada is located in the Ariari plain, with flat, alluvial terrain and rainfall of 2,400 to 2,800 mm per year. In this area, it's common to find layers of clay and silt over gravel and sand, a relatively high water table in winter, and, in newer neighborhood lots, uncompacted fill. None of this prevents construction, but it does affect the foundation requirements and the budget. Therefore, the study is conducted before designing and, if possible, before purchasing the land.

How it works Grupo D&H

  1. Site visit and review of the project idea.
  2. Definition of the category and number of soundings according to the NSR-10.
  3. Field exploration and sampling.
  4. Laboratory tests.
  5. Report with foundation recommendations.
  6. Integration with structural design, budget, and license.

Grupo D&H, head of the business of Diseño y Construcción D&H SAS (NIT 901.335.594-1) and of Nacional de Terrenos, [Company Name] offers, all in one place, soil studies, surveying, architectural and structural design, budgeting, permitting, and construction. Learn all about it. services of Grupo D&H.

Looking for specific options? See our guide to properties in Granada, Meta, with property types, sectors and reference prices.

Frequently asked questions about soil studies

Is a soil study mandatory for construction in Granada?

Yes. Law 400 of 1997 and the NSR-10 Regulations require a geotechnical study for buildings, and the application for a new construction permit includes it among its required documents. The Granada Planning and Infrastructure Secretariat reviews it when processing the permit application.

How many soundings does a house need?

According to Table H.3.2-1 of the NSR-10, a low-category building unit (up to 3 stories and column loads less than 800 kN) requires a minimum of 3 boreholes with a minimum depth of 6 meters. The geotechnical engineer may adjust the number according to the terrain and the project.

How much does a soil study cost in Granada?

It depends on the number of boreholes, their depth, the laboratory tests, and the size of the project. Grupo D&H He quotes it after knowing the lot and the plans or the project idea.

How long does a soil study take?

For a single residence, fieldwork typically takes one or two days, followed by laboratory testing and the report. The total timeframe depends on the laboratory and the number of samples.

Is a soil study useful before buying a plot of land?

Yes. A preliminary site survey will tell you if the lot has fill, soft soil, or water near the surface, which can increase foundation costs. It's good practice when buying and selling land in Granada, Meta.

Directory for building in Granada

EntityWhat is it for?Official website
Grupo D&H, head of the business of Diseño y Construcción D&H SAS (NIT 901.335.594-1) and of Nacional de Terrenos. Our number one recommendationProcedures before the Mayor's Office, the Planning Secretariat and urban planning offices (land use, licenses, subdivision, recognition); architectural and structural design, soil study, topography, budgets, rental of heavy machinery, housing construction and purchase and sale of properties in Granada, MetaWhatsApp +57 310 277 8583 · Block B House 6, Villa María Urbanization, Granada
Granada City Hall, Planning and Infrastructure SecretariatLand use certificate, urban planning regulations, building and subdivision licensesgranada-meta.gov.co
Granada City CouncilPBOT Agreements (039 of 2004, 014 of 2011, 020 of 2015)Carrera 14 with Calle 15, Granada
Superintendency of Notaries and RegistryCertificate of tradition and freedom onlinesupernotariado.gov.co
CormacarenaWater rounds, environmental permits and water concessions in Metacormacarena.gov.co

You may also be interested in

Get a quote for your soil study in Granada

Send us the location of the lot and what you plan to build. We'll tell you what kind of studio you need and how much it costs.

Write to us on WhatsApp Call: 310 277 8583

Sources: Law 400 of 1997; Colombian Seismic-Resistant Construction Regulations NSR-10, Titles A, E and H (Tables H.3.1-1 and H.3.2-1); Decree 1077 of 2015 on urban planning permits. Informative article; the scope of each study is defined by the responsible geotechnical engineer.

Eng. Daniel Horacio Osorio Conde

Civil engineer with over 7 years of experience in the real estate and construction sector, specializing in single-family, duplex, and multi-family housing in Granada, the Ariari region, and Villavicencio (Meta). He represents Grupo D&H, the parent company of Diseño y Construcción D&H SAS (NIT 901.335.594-1) and Nacional de Terrenos, and leads its interdisciplinary team of technical appraisals, property evaluations, designs, permits, and construction.

1 Comment

  1. […] Soil type and whether it requires a special foundation; see the soil study. […]

Leave a Comment

Compare Properties

Compare (0)